Principal Contractor: $0.00 – GWMWater is covering the cost of registration
A business undertaking construction work for GWMWater with a value of more than $350,000.
High Risk Contractor: $0.00 – GWMWater is covering the cost of registration
- where there is a risk of a person falling more than two metres
- on or adjacent to roadways or railways used by road or rail traffic
- in, over or adjacent to water or other liquids where there is a risk of drowning
- at workplaces where there is any movement of powered mobile plant
- structural alterations that require temporary support to prevent collapse
- in an area where there are artificial extremes of temperature
- on or near energised electrical installations or services
- involving a trench or shaft if the excavated depth is more than 1ยท5 metres
- on or near pressurised gas distribution mains or piping
- involving demolition
- involving a confined space
- on or near chemical, fuel or refrigerant lines
- involving tilt-up or precast concrete
- on telecommunications towers
- involving diving
- involving removal or likely disturbance of asbestos
- in an area that may have a contaminated or flammable atmosphere
- involving the use of explosives
- involving a tunnel
- installing scaffolding that requires a high risk work licence
- involving dogging and rigging that requires a high risk work licence
- operating cranes and hoists that requires a high risk work licence
- operating forklift trucks that requires a high risk work licence
- operating pressure equipment that requires a high risk work licence
AS/NZ4801 Certified Contractor:$0.00 – GWMWater is covering the cost of registration
All other contracting businesses: $0.00 – GWMWater is covering the cost of registration
Individual worker registration costs are also being covered by GWMWater.